Environmental lead preparing the release of a mine closure bond
Environmental / HSE manager at an end-of-life mining siteThe site has entered closure phase and closure criteria are contractual: ecological recovery must be evidenced year after year, with seasonal sampling campaigns across several stations (wetlands, reworked soils, residual watercourses). The team orders soil and water eDNA kits, performs the sampling itself following the supplied protocol, then ships the samples to NatureMetrics labs; reports land in the Nature Intelligence Platform, where per-station trends are compared against the closure baseline set at programme start. Water, soil and vegetation ecological indicators serve as evidence for the bond release application. Because pricing is not public, access is negotiated through a quote, typically on a multi-year commitment covering several campaigns. Keep in mind: without export permits in place, samples cannot be shipped to the labs — authorisations must be secured before the first campaign, otherwise an entire seasonal window is lost.

