Maintenance engineer retrofitting an ageing welding cell
In-house automation engineer at a Tier-1 automotive supplierThe plant runs three shifts and a twelve-year-old resistance welding cell needs modernising without stopping the line for more than two weeks. The original electrical drawings no longer match the floor and nobody in-house maintains the PLC program anymore. The engineer writes a specification based on site standards, then hands Presto the modification of the existing equipment: enclosure audit, redrawn schematics and BOM, rewritten Allen-Bradley program, a barcode reader added over EtherNet/IP, and on-site commissioning. Since no price list is published, the work goes through a quote; the business case is framed in downtime days avoided rather than in a subscription. Keep in mind: with no displayed pricing you must scope the work precisely before signing, back up the existing program and drawings before any intervention, and book on-site commissioning slots early because they depend on engineer availability.
